Description

NDPHC is incorporated under the Companies and Allied matters Act as a private limited Liability
company fully subscribed to by Federal, state and local governments with a mandate to manage
the power projects tagged, National Integrated Power Projects (NIPP), an emergency intervention
scheme to tackle the power problem in the country.

In all, ten new power stations are being constructed in different parts of the country including,
Alaoji (1,074MW) in Abia state, Ihovbor(451MW) in Edo state, Calabar (563MW) in Cross River
state, Egbema ( 338 MW) in Imo state, Olorunsogo in Ogun state, Gbarain (225 MW) in Bayelsa
state, Omotosho(451 MW) in Ondo state, Geregu(434 MW) in Kogi state and Omoku( 225MW)
in Rivers state.

In all, NDPHC has over 110 transmission in 27 bundles or lots comprising 5, 590 MVA of
330/132Kv transformer capacity, 3,313 MVA of 132/33Kv transformer capacity, 2,194 km
of 330Kv lines, 809 km of 132Kv lines, 10 new 330Kv S/S, 7 new 132kv S/S, Expansion of 36
existing 330kv and 132kv S/S and closing the eastern flank of the national grid loop.
About 250 distribution projects in 43 lots including 295 low loss High Voltage Distribution
System projects comprising 3,540 MVA injection substation capacity, 2,600km of 11kv lines
and 1,700km of 33kv lines across all the 36 states of the Federation including Abuja,
the Federal Capital Territory and four (4) gas projects. The NIPP power stations will add about
4,774MW of electricity to the national grid network. Many of the value chain projects are being
delivered since January 2011 with a major harvest subject to availability of gas in 2012 and full
delivery of balance of about 20 per cent of the project by late 2013.

Contact

Address:
1490 Samuel Ademulegun Crescent, CBD, Abuja, Nigeria

Phone:
+234 8055888806

E-mail:
cpr@ndphc.net

Website:
http://ndphc.net